FIs’ requirements). It must be available before December 2018.
(F) System maintenance and operation work after the go-live (helpdesk, system
monitoring staff, maintenance staff, etc.)
Continuing from Phase 1, the operation & maintenance and related works shall
be conducted by CBM.
(G) Any costs for the system after the go-live, such as expansion, upgrade or
replacement of the system infrastructure
Since this cost is not categorized to the hardware and software product
maintenance cost explained in 3.4.2.1, any other costs will be incurred after the
go-live shall be borne by CBM.
(H) Any costs for the system after the go-live, such as changes in the settings for
enhancing the function of the system
Since this cost is not categorized to the hardware and software product
maintenance cost explained in 3.4.2.1, any other costs will be incurred after the
go-live shall be borne by CBM.
(3) Other
(A) All other obligations written in Annex 4 “Major Undertakings to be taken by the
government of Myanmar” which attached to the M/D exchanged in Dec. 2017
(B) Collaboration on discussion and decision on system features
For smooth and certain execution of the project, CBM shall collaborate with a
necessary discussion and decision on system features in the design phase
(“Prerequisite” in each section under 3.2.4 for detail). In addition, the necessary
actions as follows shall be conducted by CBM in a timely manner.
The procurement process including hiring the consultants.
User acceptance test and running tests, which shall be conducted under
CBM's responsibility (refer 3.2.4.7.1).
Transition that shall be carried out by CBM (refer 3.2.4.7.1)
101