(B) Any costs related to the payment for maintenance of hardware and facilities
after 5 years from purchase of hardware and equipment
According to 3.4.2.1, any of these costs shall be borne by CBM.
(C) Arrangement and preparation of the datacenter facilities (include both primary
site and DR site)
Similar to Phase 1 project, the space and facilities necessary for installation of
equipment shall be prepared by CBM. The preparation includes the designing,
purchase and installation of security, firefighting system, electric power supply,
air conditioner, measures for small animals, etc. for datacenter.
More specifically, the following arrangements will be expected.
Arrangement for continuous use of current CDC as descripted in 3.2.4.3.4(A)
is primary expected to operate CBM-NET and CBM-OA (including
accounting system) continuously
Arrangement of server space for DR site;
➢
To select DR site where CBM can ensure to prepare space for four server
racks
➢
To prepare necessary facilities for DR site (refer 3.2.4.3.4(B) for more
detail)
➢
To ensure that the server space is available for installing equipment
before January 2019.
Preparation of operation room for DR site as written in 3.2.4.3.4(C).
(D) Any other costs for running the system after the go-live and includes the costs
related to the datacenter facilities (primary site and DR site)
In addition to datacenter prepared by CBM in above (C), any other costs related
to the datacenter (include power supply and other expense) shall be covered by
CBM.
(E) Arrangement and any costs for WAN connections for CBM-NET
Arrangement of WAN connections for CBM-NET Phase 2 (Work owner: MPT/
Budget: CBM) will be covered by CBM within the following conditions
To prepare WAN connections between primary data center and DR data
center by CBM own budget. It must be available before January 2019.
To arrange preparation of WAN connections from FIs to CBM-NET Phase 2
sites (among FI’s CBS, DR system and CBM-NET terminals, according to
100