Final Report Chapter 5 Mid-Term Development Plan another international gateway (DMS300 by TELRAD) in Naypyitaw. (2) Present Status of Submarine Cables The international submarine cable is the SEA-ME-WE3 (South East Asia - Middle East Western Europe3: completed in 1999) only. The adjacent landing points of this SEA-ME-WE3 are Mumbai, India and Singapore (Landing point in Myanmar is Pyapon.). (3) Present Status of Cross Border Networks The cross border networks consist the microwave radio communication and terrestrial optical fiber cables. Outlines are given in Table 5.2-6. MPT is under planning to utilize a part of core network by optical fiber cables (Muse, Tamu, Tarchileit, Myanwaddy) as international communication circuit. (4) Present Status of Capacity of International Circuits Number of circuits for international communications through satellite communications, submarine cables and terrestrial optical fiber cables are given in Table 5.2-6. In Myanmar, the submarine cables provide the widest bandwidth, i.e., 298E1 (596Mbps) for voices, or approx. 7.5Gbps for internet circuits. On the other hand, the satellite communication circuits provide narrowest bandwidth providing 4E1 (approx. 8Mbps). Table 5.2-6 International Communication Circuits E1(2Mbps)Interface Internet EWSD NGN Capacity IGW (ITMC (Ahlone (Gbps) Naypyitaw Yangon) Yangon) 4×E1 No. 種類 1 Satellite 2 SEA-ME-WE3 15×E1 3 Cross Border 20×E1 TOTAL 35×E1 1×E1 1×E1 282×E1 7.50996 69×E1 6.37632 355×E1 13.88628 No. Channels 115 7137+1×VoIP E1 +1×VoIP STM1 2,727 9979+1×VoIP E1 +1×VoIP STM1 Source: Provided by MPT (5) Present Status of International Circuit Switching Networks Composition of the international switching networks is shown in Figure 5.2-8. The switching equipment for international circuit are provided at five locations, i.e., at Ahlone station in Yangon and also at the IGW station in Naypyitaw. Through these stations it becomes possible to provide the redundant composition and to improve the reliability. The switching equipment in Yangon has been renewed at the software switch providing a large capacity and having completed approximately 90% of the international telephone calls. The switching equipment in Naypyitaw using rather old hardware and a new switching equipment is under construction and expected to be available within the year 2013. 5-17

Select target paragraph3