Chapter 8 Project Implementation Plan
Operation of each section
(i)
Outside Plant & Network Section
Main operation is installation designing for metro network.
(ii) Transmission, Fiber & CATV Section
The duty is Installation and O&M for metro optical cable network including CATV.
(iii) Exchange Section
The duty is O&M for exchange equipment and facilities.
(iv) IT Section
The duty is O&M for internet etc. which is IT related.
(v) Administration Section
The duty is general affairs and office work.
(vi) Post & Telegraph Section
The duty is a window related to post office
3)
Installation system
The duty is installation designing, installation supervising, commissioning and trouble
shootings.
4)
O&M System
The duty is O&M operation for the daily and the periodical.
5)
Training
Engineering staffs are insufficient at present. More staffs for new technology field would be
necessary to increase to cope with the introduction of new equipment with new technology.
Proper training, therefore, would be indispensable. MPT desires to carry out following training
programs.
(i)
Installation Designing
(ii)
Operation and Maintenance
・Testing
・Repairing
8.2.2 Personnel Plan for O&M and Management concerned for Introduction of New
Technology
With regard to shortfall in human resources for operation and management, hearing surveys
and discussions were held with the management and field-level employees at MPT. Table 8.2-2 sets
out a personnel plan for the introduction of new technology based on the results of the hearing
surveys and discussions.