Final Report 2) Chapter 8 Project Implementation Plan Operation of each section (i) Outside Plant & Network Section Main operation is installation designing for metro network. (ii) Transmission, Fiber & CATV Section The duty is Installation and O&M for metro optical cable network including CATV. (iii) Exchange Section The duty is O&M for exchange equipment and facilities. (iv) IT Section The duty is O&M for internet etc. which is IT related. (v) Administration Section The duty is general affairs and office work. (vi) Post & Telegraph Section The duty is a window related to post office 3) Installation system The duty is installation designing, installation supervising, commissioning and trouble shootings. 4) O&M System The duty is O&M operation for the daily and the periodical. 5) Training Engineering staffs are insufficient at present. More staffs for new technology field would be necessary to increase to cope with the introduction of new equipment with new technology. Proper training, therefore, would be indispensable. MPT desires to carry out following training programs. (i) Installation Designing (ii) Operation and Maintenance ・Testing ・Repairing 8.2.2 Personnel Plan for O&M and Management concerned for Introduction of New Technology With regard to shortfall in human resources for operation and management, hearing surveys and discussions were held with the management and field-level employees at MPT. Table 8.2-2 sets out a personnel plan for the introduction of new technology based on the results of the hearing surveys and discussions. 8-19

Select target paragraph3