Draft Final Report 1-1-5 1-1-6 1-1-7 Chapter 7 Outline of Scope of Works Underground Detect Radar Fusion Splicer Finding Obstacles laid underground and the locations Splicing optical cables Finding Obstacles, pipes etc. the locations and routes Optical cables connecting 3 sets OTDR (Optical Time-Domain Reflectometer) Measurement for Optical cable loss, loss of distance to connection and reflection loss and distance to defect point Measurement for long distance optical cable 30 sets 30 sets 1-2 Training Equipment 1-2-1 CAD software Office Equipment Software for drawings Merit for large scale of drawing 1 set 1-3-1 2 2-1 2-2 2-3 Desktop Computer Desktop computer for trainees Desktop computer for trainees 20 sets Dump Truck For laying areal cable Mainly for ground use Processing materials and material transportation Transporting excavated soils etc. for cable duct installation 1 car 1 car 1 car 2-4 2-5 VAN for engineers Truck with crane Transportation for various materials Wagon car for working in, such as cable splicing etc. Transportation for heavy materials, such as soils, gravels, machineries and materials Transportation for materials and workers Taking action speedy to defect points 1 car 2-6 2-6-1 HDD (Horizontal Directional Drilling) Machine HDD Machine (25-30ton) Trailer (10 wheels) 2-6-3 Crane Truck (5 ton) Merit is without damaging face of land Transporting heavy and/or long materials Suitable for transporting cable drums etc. 1car 2-6-2 Horizontal Drilling Machine underground for cable duct laying Transportation for HDD and heavy materials Transportation for long materials and heavy materials, such as duct pipes and pumping machine for mud soils 2-7 Fiber Splicing Vehicle For splicing Fiber Optic cable Splicing inside vehicle 1-3 Vehicles Crane Truck Forklift Truck Bucket Car 1car 1 car 1 car 3 cars Source: Survey team (11) Outside Plant Engineering Center (OPEC) Building Outline of Subproject (Procured under separate lot)  Construction of a building for outside plant engineering center  Building Construction Training center building (approximately 960m2 for 80 outside plant trainees, 20 CAD trainees) Yangon: 2 sites, Naypyitaw: 1 site, Mandalay: 1 site Table 7.2-11 Equipment List No Name Specification 1 Building Construction 1-1 Training Center Gross floor area :960m2 1-2 Diesel Generator Rated power:50kVA Source: Survey team 7-57 Note Q'ty Building for 80 outside plant trainees and 20 CAD trainees Emergency generator for backup power supply in case of commercial power failure 4site 4set

Select target paragraph3