Draft Final Report
1-1-5
1-1-6
1-1-7
Chapter 7 Outline of Scope of Works
Underground Detect
Radar
Fusion Splicer
Finding Obstacles laid underground
and the locations
Splicing optical cables
Finding Obstacles, pipes etc.
the locations and routes
Optical cables connecting
3 sets
OTDR (Optical
Time-Domain
Reflectometer)
Measurement for Optical cable loss,
loss of distance to connection and
reflection loss and distance to defect
point
Measurement for long distance
optical cable
30 sets
30 sets
1-2
Training Equipment
1-2-1
CAD software
Office Equipment
Software for drawings
Merit for large scale of drawing
1 set
1-3-1
2
2-1
2-2
2-3
Desktop Computer
Desktop computer for trainees
Desktop computer for trainees
20 sets
Dump Truck
For laying areal cable
Mainly for ground use
Processing materials and
material transportation
Transporting excavated soils
etc. for cable duct installation
1 car
1 car
1 car
2-4
2-5
VAN for engineers
Truck with crane
Transportation for various materials
Wagon car for working in, such as
cable splicing etc.
Transportation for heavy materials,
such as soils, gravels, machineries
and materials
Transportation for materials and
workers
Taking action speedy to defect
points
1 car
2-6
2-6-1
HDD (Horizontal
Directional Drilling)
Machine
HDD Machine (25-30ton)
Trailer (10 wheels)
2-6-3
Crane Truck (5 ton)
Merit is without damaging face
of land
Transporting heavy and/or long
materials
Suitable for transporting cable
drums etc.
1car
2-6-2
Horizontal Drilling Machine
underground for cable duct laying
Transportation for HDD and heavy
materials
Transportation for long materials and
heavy materials, such as duct pipes
and pumping machine for mud soils
2-7
Fiber Splicing Vehicle
For splicing Fiber Optic cable
Splicing inside vehicle
1-3
Vehicles
Crane Truck
Forklift Truck
Bucket Car
1car
1 car
1 car
3 cars
Source: Survey team
(11) Outside Plant Engineering Center (OPEC) Building
Outline of Subproject (Procured under separate lot)
Construction of a building for outside plant engineering center
Building Construction
Training center building (approximately 960m2 for 80 outside plant trainees, 20 CAD
trainees)
Yangon: 2 sites, Naypyitaw: 1 site, Mandalay: 1 site
Table 7.2-11 Equipment List
No
Name
Specification
1
Building Construction
1-1
Training Center
Gross floor area :960m2
1-2
Diesel Generator
Rated power:50kVA
Source: Survey team
7-57
Note
Q'ty
Building for 80 outside plant
trainees and 20 CAD trainees
Emergency generator for
backup power supply in case of
commercial power failure
4site
4set