Final Report
Chapter 7 Outline of Scope of Works
(3) Scope of upgrade
An outline of LTE base station construction in the three metro-cities is shown in Figure 7.1-12.
(4) Equipment to be introduced
A summary of the equipment that is planned to be introduced is shown below.
(a) LTE small-sized radio base station(Node B) equipment:
1,500(Node B)base stations (total for 3 metro-cities)
(b) LTE/Wi-Fi router:
1 set
(c) LTE transmission equipment:
1 set
(d) Fiber optic cable between repeater station and LTE base station:
Yangon: 615 km
Naypyitaw: 465 km
Mandalay: 420 km
7-20