Final Report Chapter 7 Outline of Scope of Works (3) Scope of upgrade An outline of LTE base station construction in the three metro-cities is shown in Figure 7.1-12. (4) Equipment to be introduced A summary of the equipment that is planned to be introduced is shown below. (a) LTE small-sized radio base station(Node B) equipment: 1,500(Node B)base stations (total for 3 metro-cities) (b) LTE/Wi-Fi router: 1 set (c) LTE transmission equipment: 1 set (d) Fiber optic cable between repeater station and LTE base station: Yangon: 615 km Naypyitaw: 465 km Mandalay: 420 km 7-20

Select target paragraph3