Final Report Chapter 8 Project Implementation Plan Table 8.2-2 Item & Components Personnel Plan for Introduction of New Technology Target Facilities Department In Charge Position Personnel Y 1. Transmission Equipment for the Optical Cable and Long Distance N Remarks M Network Designing for solving Backbone Connecting the Three Transmission problems which will be detected Metro Cities Equipment through operation Measuring Characteristics and EE 1 EE or AE 2 2 1 EE or AE 2 2 1 EE 2 2 1 EE or AE 1 1 1 EE or AE 1 1 1 AE 4 3 3 EE or AE 4 3 3 Repairing Transmission Equipment (DWDM, Router) Measuring Characteristics and Repairing for Optical Cable (Fusion splicing, Attenuation etc.) Monitoring of Network Operation 2. Outside Plant Expansion in Yangon UG Ducts Construction Metro City 3. High Speed Optical Cable Network in Yangon Metro City Auto Phone Construction Designing of UG Ducts Overhead Cable Construction Designing of Construction Overhead Cable Optical Cable & Monitoring of Metro Network Transmission Auto Phone Operation Equipment Measuring Characteristics and Repairing for Optical Cable (Fusion splicing, Attenuation etc.) 8-20

Select target paragraph3