Final Report
Chapter 8 Project Implementation Plan
Table 8.2-2
Item & Components
Personnel Plan for Introduction of New Technology
Target Facilities
Department
In Charge
Position
Personnel
Y
1. Transmission Equipment for the
Optical Cable and
Long Distance
N
Remarks
M
Network Designing for solving
Backbone Connecting the Three
Transmission
problems which will be detected
Metro Cities
Equipment
through operation
Measuring Characteristics and
EE
1
EE or AE
2
2
1
EE or AE
2
2
1
EE
2
2
1
EE or AE
1
1
1
EE or AE
1
1
1
AE
4
3
3
EE or AE
4
3
3
Repairing Transmission
Equipment (DWDM, Router)
Measuring Characteristics and
Repairing for Optical Cable
(Fusion splicing, Attenuation etc.)
Monitoring of Network Operation
2. Outside Plant Expansion in Yangon
UG Ducts Construction
Metro City
3. High Speed Optical Cable Network
in Yangon Metro City
Auto Phone
Construction Designing of UG
Ducts
Overhead Cable
Construction Designing of
Construction
Overhead Cable
Optical Cable &
Monitoring of Metro Network
Transmission
Auto Phone
Operation
Equipment
Measuring Characteristics and
Repairing for Optical Cable
(Fusion splicing, Attenuation etc.)
8-20