A/HRC/39/CRP.2 Image of Gaw Du Tha Ra village tract, taken on 9 January 2018 showing the destruction of structures, through burning, inside the red lines. This damage was first detected on 16 September 2017. Structures outside the red lines remained intact as of 9 January 2018, including most structures in the magnified area. Image of Gaw Du Tha Ra village tract, taken on 13 February 2018, five weeks later, showing terrain clearance across the entire area removing all burned and intact structures, including in the magnified area. All signs of the village are erased. New construction 1224. Terrain clearing has been followed by rapid construction and development of new buildings and infrastructure. The Mission analysed satellite images of 36 villages that show new construction, a majority in Maungdaw Township. In 23 villages, construction has taken 291

Select target paragraph3