A/HRC/39/CRP.2 Image of Let Thar village, Ah Lel Chaung village tract, below taken on 20 May 2018 showing terrain clearance, and extensive new construction of military structures on former Rohingya farmland 1237. Construction was also observed in pre-existing security facilities across the three townships. New secondary defensive fences, covering a larger perimeter, have been built around security facilities in Inn Din and Zay Di Pyin in Rathedaung Township. A similar pattern has been observed in two smaller security outposts in Maungdaw Township, and Ta Man Thar Bo Hmu Gyi, Ta Man Thar village tract, Buthidaung Township. Reinforcement measures, in the form of possible new fences or trenches within the limits of the compound, can be seen in the security facilities in Tha Pyay Taw, Tha Pyay Taw village tract, Maungdaw Township, and Pale Taung, Chin Tha Mar, Buthidaung Township. 303

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents