Source: Preparatory Survey Team
Figure 3-24 Configuration options
(3) Prerequisite
For the specification, CBM is required to determine a space for DR site prior to start
procurement of infrastructure, and develop necessary facility and connect network
between primary site before Jan. 2019. As a part of 3.3(2)(E), CBM is requested to
complete WAN connections between CBM-NET and FIs (including with DR site)
within 5 months after contract with infrastructure vendor.
For the rules regarding to introduction of this infrastructure function, CBM may
have to establish BCP includes switch over process and verification process before
connection test 1, then appoint staffs for operation.
3.2.4.2.2 Redundancy of the Data
The data in the database for CBM-NET is very important and must not be lost in
any case. From the view of importance of data, the data redundancy for CBM-NET
65