designed by the CBM-NET Phase 2 application vendor and will be confirmed by CBM in the external design phase. (6) Prerequisite For the specification, CBM will conduct required review and confirmation in timely manner. CBM is requested to submit a list of the necessary alert and dashboard functions prior to the external design phase. 3.2.4.2 Implementation Policy and Conditions of Infrastructure 3.2.4.2.1 Disaster Recovery (1) Disaster Recovery To provide a means to continue CBM-NET services if the that primary site is affected by disasters or incidents, the disaster recovery system will be implemented in this project. A remote disaster recovery (DR) site will be set up in the server room of the CBM Nay Pyi Taw Head Office. At the DR site, infrastructure for CBM-NET Phase 2 will be installed and configured. The CBM-NET system will be up and running at the DR site. Business data of CBM-NET will be replicated asynchronously between the primary site and the DR site, by using the database function. Asynchronous replication is adopted because it can be used regardless of the distance between the primary and DR sites. In addition, near-zero data loss can be achieved by using the database replication function. When DR is activated, necessary work must be done to recover the CBM-NET system at the DR site. The Targeted Recovery Point Objective (RPO) and Recovery Time Objective (RTO) 59

Select target paragraph3