(4) Data and Information Requirement
The requirement on image data and payment data for CTS will be presented and
confirmed in the design phase. The implementation and operation work in FIs will
be described in the user guidelines prepared by the application vendor.
(5) External Interface Requirement
CTS will have an interface with the CBM-NET Phase 2 application vendor for
transferring the netting data. This interface will follow the ISO 20022 standard in
the same way as the MCH netting information. The details will be confirmed in the
development phase.
Further enhancement of FI’s environment related to the cheque truncation system
(such as a connection with the FI’s internal system) will be considered and upgraded
by each FI if it is necessary.
(6) Prerequisite
For the specification, CBM will conduct required review and confirmation in timely
manner. If any change on process described in (1)(A) required (such as the last
custodian of cheque image), CBM may have to determine specification prior to make
contract with Application vendor.
For the rules regarding to introduction of this function, CBM is requested to
determine the items listed in Table 3-15 by self or with consultation with FIs. In
particular, the establishment of 1 and agreement of 2 have to be finished before
running test, and 3 may have to be determined as soon as possible (with enough time
for FIs to prepare). Moreover, CBM may have to determine the frequency and timing
of settlement, and notice it to FIs prior to go-live.