To install these systems, the CBM ICT System infrastructure consists of a data
center, servers, storages, and network infrastructure was implemented as well as
terminals for the systems in CBM and FIs in Myanmar.
Source: Preparatory Survey Team of Phase 1
Figure 1: CBM-NET Phase 1 and CBM-OA
2.2 Overview of the Development Scope of this project
In addition to adding the functions listed in Table 2 to the current functions
implemented in the Phase 1 project, introduce the equipment necessary to introduce
functions and accomplish infrastructure functions in Table 3.
1. STP
2. ISO 20022
adaptation
3. Liquidity
Saving
Feature and
Message
Queuing
Table 2: System scope of Application
STP will use SOAP/XML protocols (Transactions will be
encrypted.)
ISO 20022 will be applied to all applicable messages.
Accelerate use of CBM-NET by Increasing settlement
availability within current deposit volume.
LSF settles the payment instructions by event-driven
(such as change of liquidity) BLOS and time-driven
MLOS.
The queue will be managed by priority and posted time
of instructions.
iv