Design policy
Approach
Due to the affinity for users, this function should be designed to
be realized and utilized as an expansion of current RTGS.
Not only the liquidity for funds settlement but also for TBond/Bill by speeding up collateralization (pledge/release)
process should be considered.
Introduction of ACH
To promote the use of CBM-NET including retail payment, this
function will be implemented with consideration of the operation
suitability in Myanmar (ex. to simplify the operation work for
FIs, etc.).
Introduction of Cheque Truncation
Considering the consistency of operation, this function should be
implemented as a subsystem of CBM-NET (similar to MCH, etc.)
and connect to CBM-NET by handover the netting result.
To accomplish the rapid deployment and transition (from
current method), this function should be provided with
necessary equipment.
SOAP/XML protocol for STP
The protocol will be used for STP between CBM-NET and CBS
should be focused on its response rapidity and flexibility.
Regarding to the designing of messages, not only adopting
ISO20022 as above but also flexibility and ease of deployment
for FI should be considered.
Development of DR Site in Nay Pyi Taw
The DR site should be applied the configuration to minimize
RPO and RTO to be a model for DR site development of FIs.
In addition, redundancy of total infrastructure which avoids
SPOF should be considered.
Minimization of O&M cost, encouragement of in-house operation
Considers minimizing the operation and maintenance costs of
the system installed in Phase 2 to decrease the burden on CBM
after handover.
Allows CBM to maintain the application and infrastructure as
much as possible by the AHRD.
Latest
infrastructure
architecture
Minimization of
O&M cost
Source: Preparatory Survey Team
3.2.3 Outline Design Drawing (Scope of works)
Based on the Preparatory Survey, the scope of Phase 2 development was discussed
between stakeholders and concluded as shown below.
3.2.3.1 Application Components
Application Components are the functions that will be added to the current CBM-