Item
Description
4.
5.
6.
7.
Support for user acceptance test and running test
Establish system operation and maintenance plan and manuals
Conduct explanatory training for the officials of CBM and FIs
Technical Support for AHRD officials
Relevant
organizations of
recipient country
Responsible Agency/Principal organization: Ministry of Finance and Revenue,
(MOFR)
Implementing organization: CBM
Beneficiary
Direct beneficiary: CBM
Indirect beneficiary: FI (state-owned bank, private bank), Bank’s customer
Undertakings by
the Myanmar
side
1. Application (CBM-NET software)
(a) Any costs related to the payment for technical support for application
& infrastructure after the go-live
(b) Any costs related to the maintenance of the application after the period
of 2 (b) below
(c) Any costs for changes and addition of specification after the definition
of system requirements for the system
(d) Any costs for development of systems of agencies other than CBM
(e) Any costs for modification of the existing systems, including those
outside CBM to be connected to the new system
(f) Any costs for the system after the go-live due to changes in the system
environment, such as upgrades to the OS and middle ware
(g) Any costs for changes (upgrades and expansion) of the application after
the go-live
(h) Control of users by issuing and managing USB tokens
(i) Any costs to expand the number of users or area after the go-live
(j) Cost of the application process for use from the FIs
(k) Distribution of documents for users of FIs and CBM
(l) Preparation for running tests (including confirmation of the test plan,
business operation manual, system operation manual, DR manual,
assignment of staff to educate and train, confirmation of condition for
go-live assessment) before the running test 1 working with Technical
Cooperation Project
(m)Connection test after connection test 2 and running test after running
test 2 (for FIs that cannot prepare the STP environment until the above
period)
2. Hardware and facilities
(a) Any costs related to payments for technical support for hardware and
facilities after the go-live
(b) Any costs related to the payment for maintenance of hardware and
facilities after 5 years from purchase of equipment
(c) Arrangement and preparation of the datacenter facilities (include both
primary site and DR site)
Include the design, purchase, and installation of security for the
datacenter, firefighting system, electric power supply, air
conditioner, measures for small animals, etc.
Arrangement for continuous use of current datacenter as a
primary site (see 3.2.4.3.4(A))
Arrangement and preparation of server room in Nay Pyi Taw
Head Office as a DR site (see 3.2.4.3.4(B))
Preparation of operation room for DR site (see 3.2.4.3.4(C))
(d) Any other costs for running the system after the go-live and includes
the costs related to the datacenter facilities (primary site and DR site)
(e) Arrangement and any costs for WAN connections for CBM-NET
(f) System maintenance and operation after the go-live (helpdesk, system
monitoring staff, maintenance staff, etc.)
(g) Any costs for the system after the go-live, such as expansion, upgrade,
or replacement of the system infrastructure
16