Table 3-35 Annual O&M cost for Phase 2 (detail) (Million JPY per year) NOT in scope of Phase 2 The Scope of Phase 2 Item CBM-NET Application CBM-NET CBM- Infrastructure WAN Primary site DR site (VPN) CBM-OA MCH Total HW & SW product maintenance cost * Technical Support 45* Network fee - Total for CBM 50 10 20 50 20 150 Total for Grant aid 45 120 0 0 0 165 Total 95 130 20 50 20 315 60* 50 60* 10 - - - 40 10 215 - 10 10 80 20 20 *Hardware & software license fee of the Phase 2 project will be covered by the grant aid for the initial 5 years after purchase of equipment (approximately until 2023) Source: Preparatory Survey Team Before go-live, the O&M cost, which CBM shall bear will be approximately 100 M yen per year. After go-live of CBM-NET Phase 2, hardware and software maintenance costs for CBM-NET Phase 1 will take over by applications maintenance costs for developed applications and operation support costs for infrastructure and increase to about 60 M yen because of the additional function and infrastructure for the DR site. 3.4.2.2 Possibility for Mitigating the Operation and Maintenance Cost The operation and maintenance costs are necessary to handle any issues on the system during system operation. On the other hand, paying it continuously is not a light burden for CBM. In addition, the hardware and software product maintenance cost will be added to the burden of CBM after the 5th year from purchase of equipment (the 3rd year from go-live). Therefore, for minimizing the operation and 106

Select target paragraph3