 Define conditions for the go-live readiness assessment Running Test 1 is carried out under the responsibility of CBM. Consultants will support CBM in developing the test plan, creating manuals, education and training, preparation for participation of FIs, and conducting tests and defining conditions for the go-live readiness assessment. The CBM-NET Phase 2 application vendor and system infrastructure vendor will also support in performing this test. (G) Connection Test 2 Connection Test 2 is a test with FIs group 2 to test STP connect functions. It will be started after CBM-NET Phase 2 is in operation. The purpose of the test, items performed, and responsibilities are the same as the Connection Test 1. (H) Running Test 2 Running Test 2 is a test with FIs group 2. The purpose of the test, items performed, and responsibilities are the same as the Running Test 1. (I) Transition Preparation and performance of the transition will be carried out two times. One is at the point of CBM-NET Phase 2's go-live (in Running Test 1) and another is at the point of FIs group 2 participation to STP (in Running Test 2). For transition of the system, in addition to confirming the function and non-function of the target system and building the system environment of infrastructure and network, it is necessary that the data migration from the current system and all preparations for master data are complete. These are carried out by CBM during the running test period with support for the consultants. 93

Select target paragraph3