Source: Preparatory Survey Team
Figure 3-30 Overview of CBM-NET Phase 2 Infrastructure
3.2.4.3.2 Hardware and Software Components
Basically, the configuration of the new CBM-NET system will almost be the same as
the current configuration. The hardware of the system will be replaced.
Regarding system equipment, network devices, UPS, and racks, which can be
procured in Myanmar as much as possible, will be preferentially adopted. Especially,
equipment requiring additional procurement and expendable items, such as printer
toner, must be procured at a reasonable price in Myanmar.
Here are the lists of hardware and software that will be provided by the
infrastructure vendor, excluding network devices, racks, and UPSs.
73