4. ACH      ACH covers payment instruction exchange among FIs, specifically direct credit and direct debit. ACH receive payment instructions all time, except system maintenance time. Calculation of instruction is simultaneously conducted when ACH receives instructions from FIs. Calculation of net position will be conducted at the designated time (DTNS); the result will be settled by RTGS*. ACH will receive payment instructions via STP GW and Automatic Data Exchange function (as below) * Frequency of settlement will be defined by CBM 5. Cheque Truncation   Receive payment and image data from the presenting bank, net the payment data, and send payment and image data to the issuing banks. The result will be settled by RTGS*. Thirty-one cheque image scanners will be provided to CBM for use of FIs * Frequency of settlement will be defined by CBM 6. Anti-money laundering function  AML that detects and suspends suspicious transactions should be responsibility of FIs and will NOT be introduced to systems in CBM. 7. Alert and dashboard function  Basic alert (such as received messages, large amount transaction) and dashboard (such as operational data, financial data) functions will be implemented to CBM-NET Further functions will be implemented by the PSSD System (System for supporting PSSD business) with data from CBM-NET 8. Disaster recovery 9. Redundancy of the data  Table 3: System scope of Infrastructure  A remote Disaster Recovery (DR) site for CBM-NET8 will be set up at Nay Pyi Taw head office with active standby (that can activate immediately).  Data of CBM-NET will be replicated asynchronously by database functions.  The target RPO (the expected time gap between backup file and original file) will be Near-zero9 and the target RTO (the expected time to be restored) will be 2 hours.10.  Database servers are configured with the HA function (a failure response mechanism), SAN storage provides redundant elements to avoid single point of failure (SPOF), and data is backed up daily. 8 CBM-OA, MCH and Accounting System will not be set up at the DR site. This may vary depending on the quality of network connection 10 The RTO will be determined after verification in an actual environment 9 v

Select target paragraph3