Transactions with past settlement date will be rejected.
FIs can set not only forward date but also time frame for the processing
(e.g. Date: Dec-12th 2017, Time frame: 10:00-11:00)
One business day before the settlement day, CBM-NET Phase 2 notifies FIs
of the following information.
credit/debit amount, netting amount, number of credit/debit instructions,
designated time for settlement
Forward date transactions are, “Bank transfer (LSF)”, “Customer credit
transfer (LSF)”, “DVP request”, “ACH direct credit” and “ACH direct debit”.
Table 3-11 Forward Date Transaction
Source: Preparatory Survey Team
(2) Screen Requirement
The message format for the bank transfer (LSF) is compatible with ISO 20022
pacs.009. The message format for the customer credit transfer (LSF) is compatible
with ISO 20022 pacs.008.
Input items on the screen are almost in line with each ISO 20022 message format.
Output data can be downloaded in both PDF and XML formats.
These details will be drafted in the external design phase.
(3) Form Requirement
The system related form will be designed by the CBM-NET Phase 2 application
vendor and will be confirmed by CBM in the external design phase.
42