3 Contents of the Project
3.1 Basic Concept of the Project
3.1.1 Summary of the Project
In comparison to the situation when the first preparatory survey project was
conducted in November 2013, the environment surrounding the financial
infrastructure has changed significantly along with economic growth, the
implementation of CBS of FIs, and the need to adapt to international standards.
In order to adapt to the changes in the surrounding environment, the enhancement
of the functions on CBM-NET will be conducted in this project.
An overview of the project is summarized in the following table.
Table 3-1 Overview of the project
Item
Description
Project name
Project for Development of ICT system for Central Banking (Phase 2)
(hereinafter, Phase 2, or this project)
Base objective
Establish the financial environment to accomplish efficient and steady policies
and businesses at CBM.
Objective of the
project
Accelerate the efficiency of the entire settlement process of both CBM and FIs
and accomplish further modernization of the financial markets and policies of
Myanmar.
Outcome of the
project
The new functions based on international standards have been installed in
CBM-NET.
Project Scope
1. Implementation of new functions
(k) STP
(l) ISO 20022 adaptation
(m) Liquidity Saving Feature and Message Queuing
(n) ACH
(o) Cheque Truncation
(p) Alert and Dashboard function
(q) Disaster Recovery
(r) Redundancy of the data
(s) User Authentication
(t) Automatic Data Exchange
2. Introduce the equipment to accomplish the above functions
(c) Modify or re-establish the infrastructure for the information system
(d) Modify or re-establish the network system for the information system
3. Design and build for operation and maintenance for the systems
corresponding to the above functional request
15