(4) System Reliability
(A) System components of servers, storage and network devices must have
appropriate redundant configurations to avoid SPOF.
(B) The service level of this system will be the best effort level (Maintenance time is
expected and system downtime might occur in case of a critical failure.)
(C) In order to verify the results of processes, logs will be maintained.
(D) A remote disaster recovery (DR) site will be set up in the server room of the CBM
Nay Pyi Taw Head Office. See also (7).
(E) Data backups will be stored on tape in preparation for data corruption and for
system audits.
(5) System Scalability/Flexibility
(A) Appropriate server resource allocations will be possible using virtualized servers,
and physical servers can be added for extra workloads.
(B) Storage resources can be extended by adding HDDs and drawer units.24
(6) System Neutrality
(A) Regarding system equipment, network devices, UPS and racks, which can be
procured in Myanmar, will be preferentially adopted. Especially, equipment
requiring additional procurement and expendable items, such as printer toner,
must be procured at an appropriate price in Myanmar.
(B) As far as possible, the system should not depend on specific manufacturers and
products.
(7) Business Continuity
(A) A remote disaster recovery (DR) site will be set up in the server room of the CBM
24
The drawer unit is an equipment for install HDDs for expanding storage resources, and is
connected with the storage controller unit.