Source: Preparatory Survey Team Figure 3-29 Flow of data exchange after Phase 2 using data import function (2) Prerequisite CBM will conduct required review and confirmation in timely manner. If it is necessary to connect systems other than expected in this section after the completion of external design, it should follow the specification of CBM-NET. 3.2.4.3 System infrastructure 3.2.4.3.1 System Infrastructure Overview Basically, the configuration of the CBM-NET Phase 2 system will almost be the same as the current configuration. The hardware for the system will be replaced. The remote disaster recovery (DR) site will be set up in the server room of the CBM Nay Pyi Taw Head Office. 72