Final Report Chapter 6 Review of Works Subject to ODA Loan 6.2 Filtering and Selection of Works The works included in the wish list submitted by MPT and the recommendations made by the Japanese side shown in Table 6.1-1, excluding the 4th, 12th and 24th works, were filtered and narrowed down to a total of 22 works classified on the basis of the three strategic axes, taking into account the following conditions. 1. MPT’s priority 2. Expected time the work should be completed using the ODA loan 3. Generally expected results of ODA loan, including expression of effect Table 6.2-1 is the result of a review of the various conditions of the works included in the MPT wish list and the recommendations made by the Japanese side shown in Table 6.1-1. In Table 6.2-1 works that were selected for continued review through filtering are indicated with a circle in the Result column. Table 6.2-1 Selection from Works in the MPT Wish List and Recommendations made by the Study Team No 1 Work Selected Establishment of NOC Priority by MPT High Expected Completion Attention: not enough time for detail planning Long period of time are required to implement all proposed routes by MPT MPT is not able to wait the completion by ODA Loan Fitting to ODA Loan Equipment to be procured by ODA Loan should be on priority Concentrate to Backbone routes between 3 major cities 2 DWDM Transmission Equipment to existing or on-going FOC High 3 FOC Installation with DWDM High 5 DWDM to satellite communication link High No obstruction Relation to work No.14 Work will be formulated as sole project Integration with Work No. 8 6 Submarine Cable Installation High Long period is required to settlement of environmental issues and negotiation with foreign operator 7 Improvement of OSP facilities for Metro NW in 3 major cities High No obstruction 6-4 Result ○: selected work ○ ○ 3 routes between 3 major cities(*) ○ ○

Select target paragraph3