Final Report Chapter 5 Mid-Term Development Plan Table 5.4-1 Total no. of days joining the training of MPT staff in 2012 No. 1 2 3 4 5 6 7 8 Course Electronics・IT Outside Plant Facility Telegraph/Data Switching System Mobile Comm, Radio Transmission Postal, Telegram Test Equipment Administration TOTAL Record Training Record (Man-day) 1,280 590 130 230 Training Summary MPT Training Center in Naypyitaw, Yangon MPT Training Center MPT Training Center MPT Training Center /External Trainer 240 MPT Training Center /External Trainer 540 325 490 3,825 MPT Training Center MPT Training Center MPT Training Center /External Trainer Source: Prepared by Survey Team Total no. of average days of receiving the training of the information communication engineering, i.e., Off-the Job training is reported as 1.32 days /staff, 1) while in Myanmar, it is 0.26 day/staff, therefore, there correspond to approximately 1/5 to the figure in Japan. Therefore, much more fulfillment of the staff training is desirous at present. According to the grant aid program for urgent improving program of the communication network, agreed with Japanese Government and the Republic of the Union of Myanmar, reinforcement of the trunk communication networks connecting Yangon, Mandalay and Nepytaw, reinforcement of the intra-city communication networks, improvement of radio-access points, improvement of broadband communication environment, and strengthening the international gate station function, the newest transmission facilities and the mobile radio facilities and IP equipment, so on will be installed, in addition, staff engaging at the post, necessary technical training will be provided. In addition, knowledge in designing of the networks, construction, operation and maintenance are transferred. However, these trainings are provided for designing of the relating facilities, technique required for operation and maintenance. However, it may be still insufficient for strengthening overall function. In the same time of improving, adding and finalizing the providing systems of communication services, the demand for the internet and the broadband system will be increased accordingly. Under such circumstances, knowledge on new technologies such as the transmission networks through optical fiber cables, the access networks through optical fiber cable network and the radio access networks are indispensable for communication technicians and engineers. However, in MPT, no sufficient number of such senior engineers are available, the senior engineers given below should be available as soon as possible. 1) Human resource management and productivity in Japanese enterprise 5-34

Select target paragraph3