Final Report
Chapter 9 Environmental and Social Considerations
CHAPTER 9
9.1
ENVIRONMENTAL AND SOCIAL CONSIDERATIONS
Causal Factors of Impacts of this Project on Environmental and Social
Considerations
The causal factors of possible impacts on the environmental and social considerations from the
procurement of equipment and the execution of civil engineering works described in Section 7.3.2
are shown in Table 9.1-1.
Table 9.1-1
Causal Factors of Impacts on Main Work Processes and Environmental and
Social Considerations
Work Item
Location
Causal Factors of Impacts
Construction
(1) Transmission Equipment for Backbone
in Three Metro Cities
(2) Outside Plant Extension in the Three
Metro Cities
Yangon Duct 119.7km
MPT Premises
Public road
・ Disposal such as
packaging materials
・ Open cut sidewalk
Put duct
Reinstatement
Naypyitaw Duct 258.0km
Mandalay Duct 101.5km
(3) FOC on Aerial installation
Yangon Pole 73.5km
Public road
・ Pole erection on
10m to 20m
distance
Public Road
・ Packing materials
・ Use existing
facilities and items
(2) and (3)
Public road
・ Pole erection
・ Disposal of packing
materials
・ Disposal of packing
materials
・ Disposal of packing
materials
・ Disposal of packing
materials
・ Disposal of packing
materials
・ Disposal of packing
material
Naypyitaw Pole 16.5km
Mandalay Pole 202.0km
(4) LTE Expansion in Three Metro Cities
Yangon FOC 615km
Naypyitaw FOC 465km
Mandalay FOC 420km
(5) Network along Backbone between three
Metro Cities (10 cities)
FOC on Aerial Installation 180km
LTE Installation
MPT Premises
(6) Yangon – Thanlin Circuits
MPT Premises
(7)National Gateway Replacement
MPT Premises
(8) Upgrading ISP Services
MPT Premises
(9) NOC Construction
MPT Premises
(10 ) Materials for OPEC
Inside MPT New
Buildings
Under item (11)
Yangon 2 sites
Naypyitaw 1 site
Mandalay 1 site
9-1
Operation