Final Report Chapter 8 Project Implementation Plan Table 8.1-5 Personnel Plan for PMU Management 1 Project Director 2 Project Manager 3 Assistant Project Manager Technical Division 4 Chief Engineer 5 Deputy Chief Engineer 6 Executive Engineer General Manager Part time 1 Deputy General Manager Part time 1 Project Engineer from Project Dep’t (*) Full Time 1 from Each of Five Departments Part Time 5 from Each of Five Departments Part Time 5 from Each of Five Departments Full Time 5 from Works & Inspection Dep’t from Store Dep’t Full Time Full Time 1 1 from Accounts Dep’t from Administration Dep’t Full Time Full Time 2 2 from Each of Five Departments Full Time Total 5 29 Process Management Division 7 Procurement and Process Management Finance and Administration Division 8 Finance and accounting 10 Administration NOC Group 11 Assistant Engineer (Note) All of the members will be basically assigned from MPT and no outsource is necessary. (*) Project Department will be organized which will be in charge of overseas loans. The candidate Project Engineer is currently assigned in Mobile Department. 8.1.3 Points to note (1) Technical capability of the organization Although the technical capability to implement the project, in terms of the employees’ technical level, has already been described in Section 8.1.1 (2), there are also other points requiring attention concerning the collective technical capability of the organization. For example, for equipment maintenance, in the existing fiber optics systems only measures to tackle communication failure are in place, and the operational process is often found to be highly complicated. There are many aspects in which improvement is desirable; for example, even MPT employees do not have an accurate understanding of which facilities are functioning, and there is no recording of important parameters such as transmission loss in fiber optics systems or optical transmission equipment. In addition, it is often found that equipment manuals and system configuration drawings have not been kept and maintained in the field. Furthermore, it came to light in the hearing survey carried out for MPT that in recent years, a number of Chinese-produced products have been installed that are often found not to have been properly set up or adjusted, resulting in unstable system operation. In order to improve this situation, in terms of the soft component to be introduced under grant aid, it is planned to offer MPT employees lectures and workshops in order that “the divisions/departments of MPT might have a shared awareness of some common rules for the planning, design and implementation processes needed to secure a certain level of quality in the 8-13

Select target paragraph3