Draft Final Report Chapter 7 Outline of Scope of Works Since introduction of integrated network operation system is first challenge for MPT, it is preferable to appoint and deploy 3-5 engineers on full time basis from each technical department to run NOC. Naypyitaw Prepared by Survey Team Figure 7.1-18 Outline of NOC functions Pyawbwe LD WDM Site TaungdwinGyi LD WDM Site Pyay LD WDM Site Back Up Route “The old road” Back Up Route “The old road” WDM Optical Ring Main Route Main Route NPT LD WDM Site NPT Main NOC MDY LD WDM Site YGN LD WDM Site YGN BackUp NOC Prepared by Survey Team < Legend > WDM Optical Ring Router (VPN Router) Main Route Back Up Route “The old road” DWDM Figure 7.1-19 Outline of the monitoring network 7-34