Final Report Chapter 7 Outline of Scope of Works (2) Necessity (Relevance) MPT uses an underground duct system when laying cables in urban areas. As described in Section 7.1.3, it plans to expand the metro network using fiber optic cables, but as there is no available space in the existing ducts, more new underground embedded ducts will have to be installed. (3) Scope of upgrade The scope of the upgrade plan is shown in the metro network planned duct route in each of the following cities. (a) Figure 7.1-5 Yangon Metro Network Planned Duct Route (b) Figure 7.1-6 Naypyitaw Metro Network Planned Duct Route (1/2) (c) Figure 7.1-7 Naypyitaw Metro Network Planned Duct Route (2/2) (d) Figure 7.1-8 Mandalay Metro Network Planned Duct Route 7-7