Final Report Chapter 6 Review of Works Subject to ODA Loan 6.5 Effects Expected to be Gained through Implementation of Works Table 6.5-1 shows the effects expected to be achieved through the implementation of these 12 works. Table 6.5-1 Effects Expected to be achieved through Implementation of the Works Work Item Work No. Transmission Equipment for the Backbone Connecting the Three Metro-cities No. 1 Network Improvement in three Metro Cities No. 2,3 LTE Expansion in three Metro Cities Network Improvement in Towns along the Backbone Network between Connecting the Three Install Transmission Equipment for the Yangon – Thanlin Circuit (International Satellite Earth Station) Upgrading of ISP Services and Introducing IPv6 in Yangon Benefit to MPT Traffic increase carrying all kinds of services between 3 Metro Cities Traffic increase carrying all kinds of services to/from three Metro Cities Benefit to Users Improve the service level regarding fixed phone, mobile phone and internet throughout the country Improve the service level for all services to/from three Metro Cities Expansion of service areas regarding the services for mobile phone and internet to/from three Metro Cities No. 4 Traffic increase for mobile phone and internet to/from three Metro Cities No. 5 Effective use of improved communication infrastructures (backbone between three Metro Cities) Improvement of service level for mobile phone and internet to users in the objective medium and small cities No. 6 Increase international traffic (need to increase the circuit volume for overseas portions) Improvement of service level of telephone an internet for overseas communication users throughout the country Improvement of quality and reliability of internet service Improvement of service level of internet users throughout the country No. 7,8 Network Operation Center (NOC) Construction No. 9 Outside Plant Engineering Center (OPEC) in the Three Metro Cities No. 10,11 Thilawa SEZ Circuit No. 12 Cost reduction, improvement of operation and maintenance effectiveness for national level infrastructure and collection of basic data for further improvement Cost reduction, improvement of effectiveness and speeding up of the outside plant maintenance with HRD Cooperation with National Development Project Quick response to user complaint for network failure and improvement of service level Quick response to user complaint for network failure and improvement of service level Improvement of service level to Tenants inside Thilawa SEZ 6.6 Recommendation for Next Projects As mentioned above, in the recommendations made for this project, it was decided that a major 6-10

Select target paragraph3