Final Report
Chapter 6 Review of Works Subject to ODA Loan
Figure 6.3-1 Project Summary
Of these works, three works, No.4 “LTE Expansion in Three Metro Cities, ”No.5“ Network
Plan for Towns along the Backbone Network Connecting the Three Metro Cities” and No.12
“Thilawa SEZ Circuit,” have all, for various reasons, been prepared and reviewed using a desk
outline design method. As a result, because of the tight time constraints it has been difficult to
sufficiently take the actual implementation environment into account in creating designs.
In addition, it is highly possible that these works will be operated and managed by multiple
divisions/departments of MPT, and based on this assumption, it was expected that discussions with
MPT would take a significantly long time. Therefore, in this preparatory study, with respect to these
three works, although some field study and discussions with MPT will be implemented, a desk
outline designing process and a quantity survey based on the outline design only have been
completed. So, the designing of works that take the actual introductory environment into account
will be carried out during the detailed design process. In the report of this preparatory study, the
preconditions used in the desk outline designing process will be clearly defined so as to prevent the
occurrence of any confusion during the detailed design process due to the existence of any unclear
preconditions.
6-8