Final Report Chapter 9 Environmental and Social Considerations Table 9.5-1 Checklist Category Impact Item 1. Permissions and Explanation (1) EIA and Permissions Main Check Item (a) EIA Report is prepared? N (b) Permission of EIA Report is obtained from Government? N (c) Permission of EIA Report is issued with collateral conditions. If so, comply with collateral conditions? N (d) Necessary permissions other than the above are obtained from local authority? N (a) Contents of the project and its impacts including disclosure of information have been properly explained (2) to local stakeholders with their satisfaction? Explanation to Stakeholder (b) Feedback the comments from local stakeholders to project contents? (3)Review of (a) Reviewed several alternative plans including environmental and social considerations? alternatives 2. Pollution Control Measures (1)Air pollution (2)Water pollution (3)Waste (4)Soil pollution (5)Noise and vibration (6)Ground subsidence Y/ N N N Y Environmental and Social Consideration (Reasons of Yes/No, Reduction measures, etc.) Need to submit screening sheet to Ministry of Environmental and Forestry to be judged IEE, EIA, Environmental evaluation before project starting. After the judgment of IEE、EIA type project, implementation will start. Respond to the Ministry decision of IEE、EIA review. Need permissions from Ministry of Public Works and City Development committee in Yangon, Naypyitaw. Explanation is required regional society and obtain their understanding,. Same as as above Apply the measures for minimum impacts to environmental society. Temporary increase by construction vehicle and construction vehicle and machinery. (a) Air pollution items (Sox, NOx, Duct , etc.) emitted from projected infrastructures meet to the required values and environmental standard? Y (b) Low emission fuel to heating facilities have been applied in accommodation facilities? (CO2, NOx, Sox, etc.) (a) Discharged water or seeping water from the projected infrastructures meet the required limit and environmental standard? (a) Waste materials from the project has been possessed adequately in accordance with National standard and rules? N No plan to setting accommodation N No emission of water from the project. N No disposal from the project. (a) Discharged water or seeping water is protected against negative impact to soil and underground water? N (a) Noise and vibration level meet the required values in the country? Y No discharged water from the project Necessary measures for noise and vibration are to be taken. (a) In case of large number of underground water piping up, is there some possibilities for ground subsidence? N 9-22 No use of ground water

Select target paragraph3