Final Report
Chapter 9 Environmental and Social Considerations
Table 9.5-1 Checklist
Category
Impact Item
1. Permissions and Explanation
(1) EIA and
Permissions
Main Check Item
(a) EIA Report is prepared?
N
(b) Permission of EIA Report is obtained from Government?
N
(c) Permission of EIA Report is issued with collateral conditions. If so, comply with collateral conditions?
N
(d) Necessary permissions other than the above are obtained from local authority?
N
(a) Contents of the project and its impacts including disclosure of information have been properly explained
(2)
to local stakeholders with their satisfaction?
Explanation to
Stakeholder
(b) Feedback the comments from local stakeholders to project contents?
(3)Review of
(a) Reviewed several alternative plans including environmental and social considerations?
alternatives
2. Pollution Control Measures
(1)Air pollution
(2)Water
pollution
(3)Waste
(4)Soil
pollution
(5)Noise and
vibration
(6)Ground
subsidence
Y/
N
N
N
Y
Environmental and Social
Consideration
(Reasons of Yes/No,
Reduction measures, etc.)
Need to submit screening sheet to
Ministry of Environmental and
Forestry to be judged IEE, EIA,
Environmental evaluation before
project starting.
After the judgment of IEE、EIA type
project, implementation will start.
Respond to the Ministry decision of
IEE、EIA review.
Need permissions from Ministry of
Public Works and City Development
committee in Yangon, Naypyitaw.
Explanation is required regional
society and obtain their
understanding,.
Same as as above
Apply the measures for minimum
impacts to environmental society.
Temporary increase by construction
vehicle and construction vehicle
and machinery.
(a) Air pollution items (Sox, NOx, Duct , etc.) emitted from projected infrastructures meet to the required
values and environmental standard?
Y
(b) Low emission fuel to heating facilities have been applied in accommodation facilities? (CO2, NOx, Sox,
etc.)
(a) Discharged water or seeping water from the projected infrastructures meet the required limit and
environmental standard?
(a) Waste materials from the project has been possessed adequately in accordance with National standard
and rules?
N
No plan to setting accommodation
N
No emission of water from the
project.
N
No disposal from the project.
(a) Discharged water or seeping water is protected against negative impact to soil and underground water?
N
(a) Noise and vibration level meet the required values in the country?
Y
No discharged water from the
project
Necessary measures for noise and
vibration are to be taken.
(a) In case of large number of underground water piping up, is there some possibilities for ground
subsidence?
N
9-22
No use of ground water