Final Report
Impact Item
Chapter 9 Environmental and Social Considerations
Procedure
Land leveling
Work
Building
construction
Building
Construction
Noise,
vibration
Construction
Location
No soil disposal within
MPT premises
Reuse of temporary
materials at building
construction
Duct laying
Building
construction
①
Select 3 routes on
heavy traffic
roads(detail design
period) in Yangon,
Naypyitaw,
Mandalay
②
Building
construction site in MPT
① Sidewalk vender
activity sites in
Yangon, Naypyitaw,
Mandalay(Note)
Regional
economy
such as
employment
and life stile
Construction
Duct laying
Infections
such as
HIV/AID
Construction
Duct
laying
Pole erection
Building
construction
Instruction to workers
Working
condition
(including
safety)
Construction
Duct
laying
Pole erection
Building
construction
Safety training and
provision of safety
equipment
Duct
laying
Pole erection
Implementation of Traffic
safety measures
Accident
Construction
Timing
Responsible
Before
commencement
Once/month
during
construction
After completion
Before
commencement
Once/month
during
construction
After completion
Before
commencement
3 times during
machinery use
After completion
MPT
Before
commencement
at sidewalk
vender location
and after
recovery
Before
commencement
Once/month
during
construction
After completion
Before
commencement
Once/month
during
construction
After completion
Before
commencement
Once/month
during
construction
After completion
MPT
MPT
MPT
MPT
MPT
MPT
(Note)Along the planned construction area, sidewalk venders are available at Baw Ga Street,
Shwegondein Street, Lower Pazurdaung Street, Myin Taw Thar Street, Wai Za Yan Tar Street in
Yangon city and No.84 Street in Mandalay.
9.5 Other Items
9.5.1 Environmental checklist
The checklist (draft) for the study of environmental and social considerations which will be
required in the next stage of study is shown in Table 9.5-1. This was drafted with reference to the
9-20