Final Report Chapter 9 Environmental and Social Considerations (11) Building construction for OPEC MPT Premises ・ Land leveling ・ Construct building Public road ・ Open cut ・ Duct laying ・ Reinstatement Yangon 960 ㎡× 2 buildings Naypyitaw 960 ㎡×1 building Mandalay 960 ㎡× 1 building (12) Thilawa Circuit Duct construction 10.0km As shown in Table 9.1-1, the work sites for the work processes to be carried out in this project are limited to the premises of the MPT facility and public lands, and factors making an impact on the environmental and social considerations are ① pipe laying work and erection of telephone poles; ② land restoration within the MPT facility and station construction (See Figure 9.1-1.); and ③ disposal of packing materials during the period of construction. The construction/installation sites to be used during the construction work and after completion of the work are public roads, public lands and the premises of the MPT facility, where the land use has already been determined. No involuntary relocation of residents will be required for the implementation of this project. Figure 9.1-1 Planned construction sites for OPEC (Upper left: Yangon I; upper right: Yangon II; lower left: Naypyitaw; lower right: Mandalay) 9-2

Select target paragraph3