Draft Final Report Chapter 7 Outline of Scope of Works Present monitoring systems are individually operated by each department, each vender and each area. Proposed NOC system, however, would be difficult to cover to integrate and analyze all information data which is generated from different monitor systems mentioned above. The scope of facility to cover for the project, therefore, would be as follows, The proposed NOC system shall cover to manage only for newly constructed network. However, the system can be integrated in the particular case that the existing network applies standard technology of SNMP (Simple Network Management Protocol) etc., and MPT would supply the necessary information for integration. For the network not to being integrated, remote monitoring would be available by separating the monitoring device in NOC, using the signal sent through the monitoring network (DCN: Data Communication Network). Main process necessary to offer those facilities is as follows,  Installation of servers and monitors  Setting and maintenance of monitoring network (An outline of the monitoring network is shown in Figure 7.1-19.)  Monitoring control operated in the existing NMS shall be set up to be able to operate at the servers and monitors which are installed in NOC.  Building up data base and data analysis system  Building up reporting system NOC will be established in the new Hantharwaddy building in Yangon as a backup station for improving reliability. (4) Equipment to be introduced NOC will be constructed by the following three processes. (a) Construction of main station (Naypyitaw, Dekkhina Exchange):  Main equipment (hardware): PC server, Network devices  Software: Platform, Database, Applications, Interface  Incidental facilities: Power supply system, Air conditioning system  Security: Physical, logical (b) Establishment of backup station (Yangon, Hantharwaddy Station):  Main equipment (hardware): PC server, Network devices  Software: Platform, Database, Applications, Interface  Incidental facilities: Power supply system, Air conditioning system  Security: Physical, logical (c) System integration (5)  Main station: for backup station functional integration, testing  Main station: for backup station general coordination testing Others 7-33

Select target paragraph3