Final Report
Chapter 7 Outline of Scope of Works
example, Nyaung U, neighboring to sightseeing spot of Gaban, efforts to develop to
construct and to expand hotel zone. From these standpoints, rapid expansion of
telecommunications network is indispensable.
(f)
Numbers of LTE are shown in Table 7.1-5 in which has been calculated necessary
numbers of LTE using from the formula described in section (2), Necessity (Relevance).
No.
Table 7.1-5 Selected middle and small cities
Distance
Commer
between the
cial
City
Population
station and center
power
of city (km)
supply
State
Numbers
of LTE
station
Internet
subscribers
Pyay
45,490
0.5
Available
2
Tharyawaddy
49,197
0
Available
200
(incl. Internet
Café:25)
0
3
Zegone
14,845
0.5
Available
0
1
4
Aunglan
49,092
0.1
Available
0
3
(using
3
1
Bago
3
3
5 Internet
5
Taungtwinkyi
45,490
0.4
Available
cafes
IP STAR)
Magway
6
Magway
80,600
0
Available
118
5
7
Yenanchaung
50,000
0.8
Available
0
3
8
Pakokku
116,000
1.7
Available
24
6
79,654
0
Available
0
4
30
4
9
Mandalay
Kyaukpadung
10
Nyaung U
70,000
1.0 Available
Note: Population is that of down town in the city obtained from MPT Exchange by hearing.
Source: Prepared by Survey Team
(5)
Equipment to be introduced
Summary of the equipment planned to be introduced for the above-mentioned network
configuration is shown below.
(a)
LTE small-size radio base station equipment (Node B): 1 set
(b)
LTE/Wi-Fi Router: 1 set
(c)
LTE transmission equipment: 1 set
(d)
Fiber optic cable between repeater stations and LTE base station
Network configuration for medium and small cities is illustrated in Figure 7.1-13.
7-24