 International Gateway Services facilities  Satellite earth station facilities  Other Myanmar-based satellite facilities that can transmit telecommunications services Network Facilities Services (Class) Deploy and maintain passive network infrastructure for civil engineering and non-electronic elements, including but not limited to: Towers; Masts; Ducts; Trenches; Poles; Dark fibre. Network Services Provision of the following telecommunications services:  Resale of wire-line connectivity services  International and domestic network transport and switching services  Resale of International Gateway Services Application Services Provision of the following telecommunications services:  Public payphone services  Public Switched data services  Audio text hosting services provided on an opt-in basis  Directory services  ISP services  Public Access centre services  Messaging services  Private line voice and/or data services (including leasing Wide Area Network capacity to third parties)  Value-Added services Source: VDB-LOI, “Telecom Myanmar Update” (September 2014) Improving Coverage and Mobile Phone Reception Mobile towers provide improved reception for mobile phone users. Each mobile tower has a range of 1-5 miles; the closer the user is to the tower the better their signal will be. Nearly eight months after the launch of Telenor and Ooredoo, mobile towers dot the rural horizon or are perched on rooftops in many of Myanmar’s major cities. As of March 2015 there were over 5,000 mobile towers providing voice and data coverage to Ooredoo, Telenor, MPT, and MECtel customers (see further the Tables at the end of this chapter). On average a mobile tower can take approximately 3 weeks to construct, excluding weather delays, or difficulties obtaining the required permits authorising land use, rezoning, and construction. Each operator has subcontracted land acquisition and construction to specific tower companies, who typically subcontract elements of the process (e.g. civil work) to additional companies. By May 2015 it was reported that the two international mobile network operators had signed a second round of purchase orders CHAPTER 3: SECTOR-LEVEL IMPACTS 91 3

Select target paragraph3