4 Project Evaluation
4.1 Preconditions
4.1.1 Arrangement and preparation within CBM
ICT systems to be developed in this project will inevitably require CBM, as the executing agency,
to make necessary arrangements within CBM to accommodate the systems. CBM will be required
to make institutional arrangements for the following items:
To make physical arrangement required to accommodate the systems
To assign its internal institution responsible for service delivery by the system;
To assign its internal institution responsible for operation and maintenance of the system;
To secure budget for operation and maintenance of the system;
To prepare necessary sets of internal rules for the operation of the systems.
4.1.2 Arrangement by CBM to mobilize the Government
An environment whereby CBM-NET can be serving the financial sector should be duly arranged
through rules, new rules described in 3.3(3)(D) in particular.
4.1.3 Participation and cooperation of the FIs
FIs should be responsible for utilizing CBM-NET. The responsibilities should be exhibited by the
FIs readiness to interact with CBM based on the rules set out by CBM. Examples are the
requirement by CBM such as the preparation of STP connection with their CBSs or preparation
for cheque truncation
.
116