CBM shall prepare the space to satisfy the following requirements.
The space must be lockable.
The floor area of the space requires enough room to place four racks and other
equipment. It should also have extra space for operators to do installation work.
The load capacity of the space floor should be more than 800 kg/m2.
AC 100 V and AC 200 V power supplies should be provided.
Power supply should be more than 9 kVA/rack.
Air conditioning equipment should be installed that can keep the temperature
20ºC to 26 ºC and the humidity at 35% to 65%.
Gas fire extinguishing equipment and smoke sensing facility must be provided
to the space.
Flooding prevention should be applied to the space.
The lightning protection facility should be installed in the building and the space.
The emergency private power generation facility must be able to supply power
to the space prior to other rooms and supply power for a few hours.
(C) Requirements and plan about the operation room for DR site
The operation room is necessary at the Nay Pyi Taw Head Office to operate and
manage the DR systems.
The operation room must be lockable.
Desks and chairs are necessary to place four PCs for operation and management.
AC 100 V power supply should be provided.
Network ports are necessary to connect the four PCs to the DR system.
3.2.4.4 Consultant Supervision
Once the project has been officially approved under the conclusion of Exchange of
Notes (E/N) and Grant Agreement (G/A), CBM will have to pursue the procurement
of developers and vendors. Because that procedure requires specialized skills, CBM
will be requested by JICA to hire management consultant who will support CBM
with detailed designs and development supervision.
81