removal.  For continuous use of CDC, CBM shall confirm with the CDC provider on renewing the contract of CDC (which expires in September 2019). CBM has the right to use six racks in the CDC in YGN, and all racks are being used for the current environment (CBM-NET Phase 1: 3 racks, CBM-OA: 3 racks) based on the contract with CDC provider. In CDC, there are three available racks for the CDC Provider. However, some spaces are already being used for the equipment for CDC management. In Phase 2, the racks will be used as follows to install new equipment. [ Tentative an idea for installation of servers ] 1 Current Ph2 2 Develop After 3 release 6 racks for CBM Used by DIR CBM-NET x3 CBM-OA x3 Open Open 37U 39U N/A Open CBM-NET x3 CBM-OA x3 Ph2 Ph2 N/A Ph2 Return to DIR x3 CBM-OA x3 Ph2 Ph2 N/A Ph2 39U Source: Preparatory Survey Team Figure 3-35 Transition plan of the rack usage 1. Current Three racks are used for CBM-NET Phase 1, three racks are used for CBM-OA, and three racks are partially vacant. 2. Phase 2 Development The last partially vacant three racks will be installed as the new equipment for Phase 2. 3. After release After the new system of Phase 2 goes live in the last three racks, the current CBM-NET system running on the first three racks will be taken away and then those racks will be returned to the owner. (B) Requirements about new server room for DR site The server space at the Nay Pyi Taw Head Office is required as the DR site for Phase 2. Four racks will be placed in this room for servers, storage, network devices and UPSs. 80

Select target paragraph3