Final Report Chapter 6 Review of Works Subject to ODA Loan Figure 6.3-1 Project Summary Of these works, three works, No.4 “LTE Expansion in Three Metro Cities, ”No.5“ Network Plan for Towns along the Backbone Network Connecting the Three Metro Cities” and No.12 “Thilawa SEZ Circuit,” have all, for various reasons, been prepared and reviewed using a desk outline design method. As a result, because of the tight time constraints it has been difficult to sufficiently take the actual implementation environment into account in creating designs. In addition, it is highly possible that these works will be operated and managed by multiple divisions/departments of MPT, and based on this assumption, it was expected that discussions with MPT would take a significantly long time. Therefore, in this preparatory study, with respect to these three works, although some field study and discussions with MPT will be implemented, a desk outline designing process and a quantity survey based on the outline design only have been completed. So, the designing of works that take the actual introductory environment into account will be carried out during the detailed design process. In the report of this preparatory study, the preconditions used in the desk outline designing process will be clearly defined so as to prevent the occurrence of any confusion during the detailed design process due to the existence of any unclear preconditions. 6-8

Select target paragraph3