Final Report Impact Item Chapter 9 Environmental and Social Considerations Procedure Land leveling Work Building construction Building Construction Noise, vibration Construction Location No soil disposal within MPT premises Reuse of temporary materials at building construction Duct laying Building construction ① Select 3 routes on heavy traffic roads(detail design period) in Yangon, Naypyitaw, Mandalay ② Building construction site in MPT ① Sidewalk vender activity sites in Yangon, Naypyitaw, Mandalay(Note) Regional economy such as employment and life stile Construction Duct laying Infections such as HIV/AID Construction Duct laying Pole erection Building construction Instruction to workers Working condition (including safety) Construction Duct laying Pole erection Building construction Safety training and provision of safety equipment Duct laying Pole erection Implementation of Traffic safety measures Accident Construction Timing Responsible Before commencement Once/month during construction After completion Before commencement Once/month during construction After completion Before commencement 3 times during machinery use After completion MPT Before commencement at sidewalk vender location and after recovery Before commencement Once/month during construction After completion Before commencement Once/month during construction After completion Before commencement Once/month during construction After completion MPT MPT MPT MPT MPT MPT (Note)Along the planned construction area, sidewalk venders are available at Baw Ga Street, Shwegondein Street, Lower Pazurdaung Street, Myin Taw Thar Street, Wai Za Yan Tar Street in Yangon city and No.84 Street in Mandalay. 9.5 Other Items 9.5.1 Environmental checklist The checklist (draft) for the study of environmental and social considerations which will be required in the next stage of study is shown in Table 9.5-1. This was drafted with reference to the 9-20

Select target paragraph3