Final Report
Chapter 8 Project Implementation Plan
Table 8.1-5 Personnel Plan for PMU
Management
1 Project Director
2 Project Manager
3 Assistant Project Manager
Technical Division
4 Chief Engineer
5 Deputy Chief Engineer
6 Executive Engineer
General Manager
Part time
1
Deputy General Manager
Part time
1
Project Engineer from Project Dep’t (*)
Full Time
1
from Each of Five Departments
Part Time
5
from Each of Five Departments
Part Time
5
from Each of Five Departments
Full Time
5
from Works & Inspection Dep’t
from Store Dep’t
Full Time
Full Time
1
1
from Accounts Dep’t
from Administration Dep’t
Full Time
Full Time
2
2
from Each of Five Departments
Full Time
Total
5
29
Process Management Division
7 Procurement and Process Management
Finance and Administration Division
8 Finance and accounting
10 Administration
NOC Group
11 Assistant Engineer
(Note) All of the members will be basically assigned from MPT and no outsource is necessary.
(*) Project Department will be organized which will be in charge of overseas loans. The candidate Project Engineer is
currently assigned in Mobile Department.
8.1.3
Points to note
(1) Technical capability of the organization
Although the technical capability to implement the project, in terms of the employees’ technical
level, has already been described in Section 8.1.1 (2), there are also other points requiring attention
concerning the collective technical capability of the organization.
For example, for equipment maintenance, in the existing fiber optics systems only measures to
tackle communication failure are in place, and the operational process is often found to be highly
complicated. There are many aspects in which improvement is desirable; for example, even MPT
employees do not have an accurate understanding of which facilities are functioning, and there is no
recording of important parameters such as transmission loss in fiber optics systems or optical
transmission equipment. In addition, it is often found that equipment manuals and system
configuration drawings have not been kept and maintained in the field. Furthermore, it came to light
in the hearing survey carried out for MPT that in recent years, a number of Chinese-produced
products have been installed that are often found not to have been properly set up or adjusted,
resulting in unstable system operation.
In order to improve this situation, in terms of the soft component to be introduced under grant
aid, it is planned to offer MPT employees lectures and workshops in order that “the
divisions/departments of MPT might have a shared awareness of some common rules for the
planning, design and implementation processes needed to secure a certain level of quality in the
8-13