Draft Final Report
7.2
Chapter 7 Outline of Scope of Works
Procurement and Civil Works
The project consists of 12 subprojects divided among four development schemes as shown in Figure
7.2-1. The subprojects are outlined in this sub clause.
Capacity Development of Infrastructure
Telecommunication Service Development
No.1:
Transmission Equipment for the Backbone Connecting the
Three Metro Cities
No.6:
Installation of Transmission Equipment for the Yangon Thanlin Circuit (International Satellite Earth Station)
No.2:
Outside Plant Extension in the Three Metro Cities
No.7:
National Gateway Overhaul
No.3:
High Speed Optical Fiber Network in the Three Metro Cities
No.8:
Upgrading of ISP Services and Introducing IPv6 in Yangon
No.4:
LTE Expansion in the Three Metro Cities
Business Management
No.5:
Network Plan for Towns along the Backbone Network
Connecting the Three Metro Cities
No.9:
Network Operation Center (NOC) Construction
National Development Project Assistance
No.10:
Outside Plant Engineering Center (OPEC) in the Three Metro
Cities
No.12:
Thilawa SEZ Circuit
No.11:
Outside Plant Engineering Center Building
Source: Survey team
Figure 7.2-1 Project Scope (tentative)
(1)
Transmission Equipment for the Backbone Connecting the Three Metro Cities
Outline of Subproject
Development of three 500G backbone routes connecting the three metropolitan cities (fiber optic
cables have already been installed by MPT.)
Table 7.2-1 Equipment List
No
Name
DWDM (Type 1A)
1
DWDM(Type 1B)
2
3
DWDM (Type 1C)
Specification
Function: Optical Multiplexing
Capacity:100G×5λ
Configuration:2 way ROADM
providing SDH, Ethernet
interface included NMS
integration
Function: Optical Multiplexing
Capacity: 100G×5λ
Configuration: 3 way ROADM
providing SDH, Ethernet
interface included NMS
integration
Function: Optical Multiplexing
Capacity: 100G×5λ
7-45
Note
High speed network
establishment
Q'ty
19set
Ditto
3 set
Ditto
1 set