Draft Final Report
Chapter 7 Outline of Scope of Works
component.)
(b) 10GbE Router x 1
(c) L2 Switch (1GbE/10GbE) x 2
(d) Optical fiber cable:10km
(5) Others
For the installed communication equipment in Marine University
The communication equipment supplied by the Project for Urgent Improvement of
Communication Networks by Japan grant aid is temporarily installed at the corridor between the
class rooms in the university. Communication equipment under the loan project is also planned to
be installed there. In this connection, suitable air conditioning facility is desirable for securing
equipment operation and suitable partition is to be provided for security.
For construction of optical fiber cable connecting between Thilawa SEZ and
Thanlyin Exchange
Existing overhead fiber optic cables connected from Thanlyin exchange to Khauktan exchange
have 24 and 12 cores. A manhole shall be constructed at the suitable point about 10 km off from
Thanlyin exchange to the south (at latitude 16 °41′ 09.276″ N and at longitude 96°18′ 32.328″ E)
along the existing cables and new underground fiber optic cable to be connected to existing optical
fiber cable at the said manhole point. The manhole point is confirmed to be free from passages and
a public area. The optical fiber cable route which is planned to be laid for ring road around Thilawa
SEZ area has so narrow pedestrian and shoulder that the attention shall be taken to the passers to
prevent accidents with consideration of taking a distance from the road with a bank etc. in case that
any structure such as manhole or cabinet for connecting cables would be constructed.
7-42