Final Report Chapter 7 Outline of Scope of Works example, Nyaung U, neighboring to sightseeing spot of Gaban, efforts to develop to construct and to expand hotel zone. From these standpoints, rapid expansion of telecommunications network is indispensable. (f) Numbers of LTE are shown in Table 7.1-5 in which has been calculated necessary numbers of LTE using from the formula described in section (2), Necessity (Relevance). No. Table 7.1-5 Selected middle and small cities Distance Commer between the cial City Population station and center power of city (km) supply State Numbers of LTE station Internet subscribers Pyay 45,490 0.5 Available 2 Tharyawaddy 49,197 0 Available 200 (incl. Internet Café:25) 0 3 Zegone 14,845 0.5 Available 0 1 4 Aunglan 49,092 0.1 Available 0 3 (using 3 1 Bago 3 3 5 Internet 5 Taungtwinkyi 45,490 0.4 Available cafes IP STAR) Magway 6 Magway 80,600 0 Available 118 5 7 Yenanchaung 50,000 0.8 Available 0 3 8 Pakokku 116,000 1.7 Available 24 6 79,654 0 Available 0 4 30 4 9 Mandalay Kyaukpadung 10 Nyaung U 70,000 1.0 Available Note: Population is that of down town in the city obtained from MPT Exchange by hearing. Source: Prepared by Survey Team (5) Equipment to be introduced Summary of the equipment planned to be introduced for the above-mentioned network configuration is shown below. (a) LTE small-size radio base station equipment (Node B): 1 set (b) LTE/Wi-Fi Router: 1 set (c) LTE transmission equipment: 1 set (d) Fiber optic cable between repeater stations and LTE base station Network configuration for medium and small cities is illustrated in Figure 7.1-13. 7-24

Select target paragraph3