Final Report Chapter 7 Outline of Scope of Works Table 7.1-3 Mandalay Metro New Fiber Routes No. Routes 1 Central Office-Pygyitagon Sub Total 96core 2 Central Office-Nan Shate Central Office-Chanmyatharsi 3 Distance (km) Ducts (Note 1) (mm× pipe) 13.0 Spare Cores in existing cable (Note 2) Optical Cables Remark 96 Core Aerial 0 48 Core Aerial 16 (Aerial Laying) 48 Core Aerial 0 13.0 4.0 10.0 4 Central Office-Shansu 4.5 100φ×4 48 Core U/G Laying 18 (Aerial Laying) 5 Central Office-Daewun 6.0 100φ×4 48 Core U/G Laying 0 6 Central Office-Myuak Pyin 6 100φ×4 48 Core U/G Laying 0 7 Central Office-Guest House 3 100φ×4 48 Core U/G Laying 0 48 Core U/G Laying 2 (Aerial Laying) Central Office Manmyanmar 8 1.5 100φ×4 10.0 100φ×4 48 Core U/G Laying New installation 10 Pygyitagon-Chanmyatharsi 6.0 100φ×4 48 Core U/G Laying 4 (Aerial Laying) 11 Pygyitagon-Mahar Myaing 6.0 100φ×4 48 Core U/G Laying 12(Aerial Laying) 12 Amarapura-Shansu 6.0 100φ×4 48 Core U/G Laying 18 (Aerial Laying) 10.0 100φ×4 48 Core U/G Laying 18 (Aerial Laying) 14 Industrial Zone-Swe Daw 5 100φ×4 48 Core U/G Laying 0 15 Nan Shate-Mahar Myaing 5 100φ×4 48 Core U/G Laying Chanmyatharsi-Mahar Myaing 6 48 Core U/G Laying 6 (Aerial Laying) 17 Chanmyatharsi-Shansu 5 100φ×4 48 Core U/G Laying New installation 18 Mahar Myaing-Shansu 7 100φ×4 48 Core U/G Laying New installation 19 Daewun-Shansu 6.0 100φ×4 48 Core U/G Laying 0 20 Nan Shate- Pathein Gyi 8.0 100φ×4 48 Core U/G Laying 0 9 Pygyitagon-Amarapura 13 Amarapura-Industrial Zone 16 Sub Total 48core 115.0 Fiber Optic 48core 115.0 Fiber Optic 96core 13.0 Cable duct 100φ×4 101.0 100φ×4 Summary (Note 1): Unit for 100 is mm andφshows diameter. (Note 2): 60% of cable routes are fully occupied (no spare cores) or new installation is required. 40% area aerial cables which are planned to be replaced to the U/G (underground) newly installed one by one because of being decrepit. 7.1.3 High speed optical fiber network in three metro cities (1) Current situation There is no room for expansion using the existing cables of the metro network in the three metro-cities, aerial cables are used in many places and the lack of stability is a problem. On the other hand, trunk lines are also in short supply. 7-14

Select target paragraph3